HYLTON ROAD IMPROVEMENTS

FLOODING AND HIGH TRAFFIC ISSUES ADDRESSED
Client City of Springdale
Location Springdale, Arkansas
Schedule Completed: 2013

Project Detail

Client:
City of Springdale, Arkansas

Cost:
Construction Bid:  NA, Constructed by City

Completed:  2013

Client Contact:
Sam Goade
Public Works Director
Springdale Public Works Dept.
269 E. Randall Wobbe Ln
Springdale, AR 72764           479-750-8135
The Hylton Road project included approximately 0.75 miles of paving Hylton Road from Don Tyson Parkway to Highway 412.

The design included widening Hylton Road from a two lane dirt road to a 36-foot wide minor collector including asphalt/concrete paving, storm drainage with curb and gutter and two multiple barrel box culverts, striping, signage and all other necessary appurtenances.

In addition, MWY provided the site planning for the proposed Hylton Road Junior High School adjacent to the road improvement. This includes the relocation and upsizing of the sewer lines along Julio Road intersecting with Hylton Rd.