SONORA ROAD WIDENING AND SIGNALIZATION

SCHOOL SAFETY ENHANCED BY PROMPT DESIGN
Client Springdale Public School District
Location Springdale, AR
Schedule Completed: On Time Aug. 2012

Project Detail

In order to accommodate additional traffic from a new middle school, Sonora Road was widened from two lanes to three lanes, and a traffic signal was added to the intersection with the five-lane U.S. Highway 412.

The project required a traffic study and heavy coordination with the AHTD.

A major challenge was the tight construction timeline. In order to complete the signal before school began, the design was accelerated. MWY then worked with the contractor to reduce the lead time on the equipment delivery in order to have the signal operational in time for the first day of school in August 2012, enhancing the safety for children and parents.

MWY performed design and full construction administration and observation services on the project, and associated with Peters and Associates, Inc. of Little Rock, who performed the traffic study and signal design.
CLIENT:
City of Springdale, Arkansas

COST:
Opinion of Probable Cost: $1,600,000
Construction Bid: $1,445,994
Final Construction Cost:     $1,323,987

COMPLETED:
CLIENT:
Springdale Public School District; Springdale, Arkansas

COST:
Opinion of Probable Cost: $400,000
Construction Bid:       $293,220
Final Construction Cost:      $334,441 (Some minor additions required by AHTD after bid)

COMPLETED: On Time Aug. 2012

CONTACT:
Dr. Gary Compton
Assistant Superintendent Support Services
Springdale Public School District
1612 E. Emma Avenue
Springdale, Arkansas 72764
479-750-8745

CONTACT:
Patsy Christie, Director
Planning and Community Development Division
City of Springdale 201 Spring Street
Springdale, AR  72764
(479) 750-8550